Home Mayor's Comments City Adm/ Utility Mgr Building Safety Clerk/Treasurer Meetings/Agendas City Council Committees Community Eco/Dev. Engineering Library Local Links Map Planning and Zoning Parks & Recreation Police Human Resources Public Works Recreation Trail Views of the City Airport Cemetery City Utilities

Community Development – Engineering

City Administrator/Utility Manager

608-647-4448
 

ENGINEERING (CITY ENGINEER OF RECORD)

 

 

ENGINEERING: Responsible for setting the mission and goals for engineering projects. Manage the City’s Capital Improvement Program and provide the corresponding supervision and inspection of design and installation of public facilities and infrastructure. Coordinate City, State and Federal Local Road Project Programming. Review plans and provide inspection for commercial and residential land development projects to ensure compliance with the City and State PUD or Subdivision laws, state and federal regulations and local ordinances. Reviewing permit applications and plans submitted for new construction, additions, remodels, and alterations. Maintain record maps and documents for all public infrastructures. Provide management of all traffic and circulation functions within the city. Prepare infrastructure studies and master plans.

ENGINEERING FEES  UNDER REVIEW   CITY RESOLUTION 22:      and CITY RESOLUTION 2006 - XXXX  

COUNCIL POLICY - EXTENSION OF UTILITIES - RESOLUTION 22 - PDF 

 

STORM WATER RUN OFF INFORMATION

 

Storm Water Run Off Plans / NOI’s (NR 151/216)    http://www.cleanways.org

 

Publications: Information on Storm Water Run Off / NOI's, (NR 151/216)

http://www.dnr.state.wi.us/org/water/wm/nps/publications/pubs.htm

 

DNR WEB SITE: NOI FORMS:                                         

http://www.dnr.state.wi.us/org/water/wm/nps/stormwater.htm

 

CAPITAL INVESTMENT / IMPROVEMENT PROGRAM - MASTER LISTING - PDF

 

PRIVATE BUSINESS AND CORPORATION PROJECTS  (Under Construction)

 

·          Hospital Remodeling: In-Progress

·          Pine Valley Remodeling: In-Progress

·          Walgreens, Hwy 14 (Conceptual and Preliminary Plans Approved, Developer FLAD working

            with Walgreens Corporate office, waiting official notice)

·          

                 

 

COMMUNITY STREETS, ROADS, BRIDGES, CURBS, GUTTERS, SIDEWALKS AND PARKING AREAS

 

Current Projects:

 

·          Orange Street Commons, Hwy 14 (Redevelopment Project under TIF) YEAR 2005, 2006, 2007

-          Four City Blocks: Demo site, hazard remediation of sites

-          Add new water, waste water, storm sewer systems

-          Construct new buildings, parking lots, sidewalk, park area

-          -     Project Management: ROED (Developer), RCEDC Coordinator / City Administrator/Utility Manager

-          -     Engineer: LEISH, MSA and Town and Country

Status: Under Construction:

The Orange Street Commons Project is a three and one-half block redevelopment project located on U.S. Highway 14 in the heart of our City.  The project will revitalize this area, create 50 to 100 new jobs, enhance the tax base of this area and stimulate new development in our downtown area.  Suggested developments in this area are an engineering firm, a restaurant, a retirement home, a motel, a printing firm, and a computer company.  Current activities include finalizing a developers agreement, acquisition of properties, and environmental testing.  Many grants have been obtained to assist in the financing of this project.

·          New Neighborhood, HWY 14 (Redevelopment Project under TIF) YEAR MULTIPLE

-          450 Acres, mixed use, commercial and residential, HWY 14 intersection

-          Water, Waste Water, Storm Sewer systems

-          Construct commercial and residential area, new streets, sidewalks, green space

-          -     Project Management: RCEDC Coordinator / City Administrator/Utility Manager

-          -     Designer and Engineer: Ken Saiki Design,  MSA

Status: Under Conceptual Design:  Presentation being prepared for Planning Commission

 

·          Norman Drive Extension (Woodland Hills LLC - Assessment District Project) YEAR 2006

-          City Street, Curb/gutter, Water, Sanitary Sewer, Storm Sewer, Bridge Cross section 

-          Project Management: City Administrator/Utility Manager

-          -     Engineer: Westbook Associated Engineering, Inc

Status: Under Construction:

 

·         North Industrial Park (General Fund and TIF Project) YEAR 2006

-          Complete Design for remaining 1/4 Industrial Park

-          New Street, curb and gutter

-          New Water and Waste Water Infrastructure

-          New Storm Water Management Plan (NR 151/216)

-          -     Project Management: City Administrator/Utility Manager/Zoning Admin.

-          -     Engineer: MSA

Status: Developing Regional Storm Water Program for Final Phase:

 

·         Pine River - Flood Plain Review (Flood Way, Flood Fringe) YEAR: 2005, 2006

-          Convert Flood Control - Hec 2 to Hec Raz Water Model

-          Update Flood Plain Maps, filed with DNR and FEMA

-          Recover "Restricted Build" lands and remove easements

-          Associated "City" Storm Water Management Plan (NR 151/216)

-          -     Project Management: City Administrator/Utility Manager/Zoning Admin.

-          -     Engineer: Clark Dietz

Status: Under Review, DNR and FEMA plus Hydo modeling:  

 

·         HWY 14-West, Roadway  (Federal/State and City General Fund and Utility Project) YEAR: 2010-2011

-          Design being determined

-          Reconstruct Roadway, add curb and water run off gutter

-           Update Water and Waste Water Infrastructure

-          -     Project Management: WI DOT, City Administrator/Utility Manager/Zoning Admin.

-          -     Engineer: MSA

Status: Preliminary Design, State DOT:

 

·         Foundry Concept: Foundry/Hill Top Dairy / Electrical Substation (General Fund and TIF Project) YEAR 2006, 2007, 2008

-          Complete preliminary subdivision design for review by public works committee

-          New Industrial Roadway, curb and gutter

-          New Water and Waste Water Infrastructure

-          New Storm Water Management Plan (NR 151/216)

-     Electric Substation Site

-          -     Project Management: City Administrator/Utility Manager/Zoning Admin.

-          -     Engineer: MSA / Forrester

Status: Preliminary Concept Design Only

 

Projects Under Planning and Development:  2007, 2008 Projects

2007

·        Traffic Analysis Study HWY 80, Sextonville Road, Commercial and Industrial Traffic (TIF Project)

·            -      Project Management: City Administrator / Utility Manager,  Planner or Engineer: Unassigned

2007

·        “New Neighborhood Project, HWY 14 and Star Light Drive area (Township, CITY and RDA)

·            -      Project Management: RCEDE Coordinator / City Administrator/Utility Manager,  Engineer: MSA,

Letters mailed to State and Federal representatives for new intersection new RC Mall.

2007

·         Planning Areas: West Pine River (Foundry) and East Pine River (Richland Mall)

·            -      Project Management: RCEDE/Coordinator / City Administrator/Utility Manager,  Engineer: MSA / LIESH

2007

·         Commercial/Industrial Building - Voids and Saturation Study Areas: Industrial Districts

·            -      Project Management: City Administrator/Utility Manager,  Planner or Engineer: Unassigned

2007                  

·         Down Town Revitalization Study: Commercial District

·            -      Project Management: City Administrator/Utility Manager,  Planner or Engineer: Unassigned

Grant Funding requested of WHEDA.   2007 Project.                                                

 

 

 

AIRPORT – PROJECTS (Requested 2004 and 2009)

 

Airport Planning

·         Location: Richland Center Municipal Airport

·         Update Storm Water Management Plan (NR 151/216)

·         Beacon (State Program)

·         Tractor for Airport (Received, and Staff Training Occurring)

·         Maintenance Hanger for new Tractor

·         Transient Aircraft Hanger

·         T- Hanger

             -     Project Management: City Administrator/Airport Manager

       -     Engineer: MSA

Status: In-Progress:

 

·         Land Use / Height Restriction Ordinance

             -     Project Management: City Administrator/Airport Manager

             -     Engineer: None Assigned

Status: Under review by Airport Committee:

 

UTILITY COMMISSION – PROJECTS            

·  Update City Waste Water Treatment Plant:   Road Map To A Decision on WWTP (PPT)  

- Location: Undetermined

          -     Project Management: City Administrator/Utility Manager/Waste Water Superintendent

              -     Engineer: Town and Country

Status: In-Progress, AD-HOC Committee created, meeting scheduled being developed

The engineering firm contracted by City Utilities of Richland Center has completed the initial facility study for an upgraded or new treatment plant.  The cost ranges from $14-24 million depending on which alternative is selected.  Further refinement of the facility study will continue over the winter months.

Utility Staff, our Engineering Consultants, and the Mayor have been working with the industries that contribute waste to our plant and have a major impact on the odor problem when large loadings occur that are more than the plant can handle.  We are extremely pleased with the actions of these industries.  As everyone is aware, the odor problem at the plant has been reduced to acceptable levels on most days.  We have had occasional over-loadings but they have occurred on such a limited basis that the plant has been able to "belch a couple of times" and manage the "loading". You can be assured that City Utilities of Richland Center is working on a daily basis to arrive at a solution that will be cost effective as to rates charged for sewer services and the environmental concerns of the residents of the City.

 Purchase "Pine River" Substation or Develop New Substation (City/TIF/Utility Project) YEAR 2006, 2007

·               Location: Near RC Foundry

·               Project Management: City Administrator/Utility Manager/Electric Superintendent

        -     Engineer: Forrester

Status: In-Progress:

 

New Water Well and Water Storage Capacity YEAR 2006, 2007, 2008

·             Location:  New Well / Water Capacity Facility Along HWY 14 In East and West

·            Location:  Hwy 14, High School Area and Hwy 14, Wal-Mart area (City TIF / Utility Project)

    Project Management: City Administrator/Utility Manager/Water Superintendent

     -     Engineer: MSA

Status: In-Progress:

 

 